Fourth Phase of ACE Transition Set for July 23; Fifth Phase to be Required
Monday, May 23, 2016
Sandler, Travis & Rosenberg Trade Report
- 02: consumption – quota/visa
- 07: consumption – antidumping/countervailing duty and quota/visa
- 12: informal – quota/visa (other than textiles)
- 21: warehouse
- 22: re-warehouse
- 31: warehouse withdrawal – consumption
- 32: warehouse withdrawal – quota
- 34: warehouse withdrawal – AD/CV duty
- 38: warehouse withdrawal – AD/CV duty and quota/visa
- 61: immediate transportation
- 62: transportation and exportation
- 63: immediate exportation
- 69: transit (rail only)
- 70: multi-transit (rail only)
CBP also indicates that there will be a fifth, as-yet-unscheduled phase of the transition when electronic entry and entry summary filings for the following entry types will be required in ACE. Until that time they must continue to be filed only in ACS.
- 08: NAFTA duty deferral
- 09: reconciliation summary
- 41: direct identification manufacturing drawback
- 43: rejected merchandise drawback
- 44: substitution manufacturer drawback
- 45: substitution unused merchandise drawback
- 46: other drawback
No comments:
Post a Comment